Full and open
Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP)
DEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION GREAT LAKES AND OHIO.ENDIST LOUISVILLE.W072 ENDIST LOUISVILLE posted "Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP)". It is a Full and open solicitation. Responses are due Dec 3, 2026.
- Agency
- DEPT OF DEFENSE · W072 ENDIST LOUISVILLE
- Deadline
- Dec 3, 2026
- Place of performance
- Not listed
- Set-aside
- Full and open
The full dashboard, alerts, and the rest of the open list are in BidYard.